dbo:abstract
|
- Kanpur Metro is a rail-based mass transit system serving the city of Kanpur, Uttar Pradesh, India, and extendable to the Kanpur metropolitan area. The feasibility study for the project was done by RITES in June 2015. Construction of the orange line begun on 15 November 2019 with the 8.98 km (5.3 mi) stretch from IIT Kanpur to Motijheel. The study was prepared to control traffic woes and congestion, which are hampering the growth, development, and prosperity of the city area. Two corridors were approved by the government as per Detailed Project Report (DPR). The tenders were floated for the priority section of corridor-1 between IIT Kanpur to Motijheel. AFCONS Infra has been awarded the tender. On 28 February 2019, the Central Government approved the metro project for Kanpur at an estimated cost of ₹ 11,076.48 crores and a five-year time limit. Construction work on the project began on 15 November 2019, with the first section opened in December 2021. The first phase was inaugurated by Prime Minister Narendra Modi on 28 December 2021. (en)
- Канпурский метрополитен (хинди कानपुर मेट्रो, англ. Kanpur Metro) — действующий метрополитен в индийском городе Канпур, штат Уттар-Прадеш. (ru)
- 坎普爾地鐵是印度北方邦坎普爾的地鐵系統。橙線工程於2019年11月15日開展,全長8.98公里,2021年12月28日通車。 (zh)
|
dbo:headquarter
| |
dbo:location
| |
dbo:numberOfStations
|
- 8 (xsd:nonNegativeInteger)
- 9 (xsd:nonNegativeInteger)
- 12 (xsd:nonNegativeInteger)
|
dbo:openingDate
| |
dbo:openingYear
| |
dbo:operator
| |
dbo:owner
| |
dbo:topSpeed
| |
dbo:type
| |
dbo:typeOfElectrification
| |
dbo:voltageOfElectrification
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 35090 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:alt
|
- Kanpur metro orange line rolling stock (en)
|
dbp:beganOperation
| |
dbp:caption
|
- Kanpur metro inaugural run (en)
- Orange Line Rolling stock (en)
|
dbp:character
|
- Elevated & Underground (en)
|
dbp:el
| |
dbp:frameHeight
| |
dbp:frameWidth
| |
dbp:headquarters
|
- Kanpur Metro Depot, Gurudev Chauraha, Kanpur, Uttar Pradesh, 208024, India (en)
|
dbp:headway
| |
dbp:lineNumber
|
- (en)
- Blue Line – 2 (en)
- Orange Line – 1 (en)
|
dbp:lines
| |
dbp:locale
| |
dbp:name
|
- Kanpur Metro (en)
- कानपुर मेट्रो (en)
|
dbp:operator
|
- Uttar Pradesh Metro Rail Corporation (en)
|
dbp:owner
| |
dbp:stations
|
- Operational: Phase 1 Orange Line
9 stations - 8.98 km
IIT Kanpur - Motijheel
Under Construction - Orange Line
12 Stations - 14.805 km
Chunniganj - Naubasta
Blue Line
8 stations - 8.6 km
CSA University - Barra 8 (en)
|
dbp:systemLength
|
- Blue Line (en)
- Phase 1 - Orange Line (en)
|
dbp:trainLength
| |
dbp:transitType
| |
dbp:website
| |
dbp:wikiPageUsesTemplate
| |
dbp:zoom
| |
dcterms:subject
| |
gold:hypernym
| |
rdf:type
| |
rdfs:comment
|
- Канпурский метрополитен (хинди कानपुर मेट्रो, англ. Kanpur Metro) — действующий метрополитен в индийском городе Канпур, штат Уттар-Прадеш. (ru)
- 坎普爾地鐵是印度北方邦坎普爾的地鐵系統。橙線工程於2019年11月15日開展,全長8.98公里,2021年12月28日通車。 (zh)
- Kanpur Metro is a rail-based mass transit system serving the city of Kanpur, Uttar Pradesh, India, and extendable to the Kanpur metropolitan area. The feasibility study for the project was done by RITES in June 2015. Construction of the orange line begun on 15 November 2019 with the 8.98 km (5.3 mi) stretch from IIT Kanpur to Motijheel. On 28 February 2019, the Central Government approved the metro project for Kanpur at an estimated cost of ₹ 11,076.48 crores and a five-year time limit. Construction work on the project began on 15 November 2019, with the first section opened in December 2021. (en)
|
rdfs:label
|
- Kanpur Metro (en)
- Канпурский метрополитен (ru)
- 坎普爾地鐵 (zh)
|
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:homepage
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Kanpur Metro (en)
- कानपुर मेट्रो (en)
|
is dbo:isPartOf
of | |
is dbo:owner
of | |
is dbo:owningOrganisation
of | |
is dbo:service
of | |
is dbo:type
of | |
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is dbp:owned
of | |
is dbp:services
of | |
is dbp:subdivisionType
of | |
is dbp:system
of | |
is foaf:primaryTopic
of | |