Rhys Jones’ Post

View profile for Rhys Jones

RWE EC&I Engineering Placement

After 9 months at Little Barford Power Station, I’ve finally seen her run. Following a catastrophic failure of our 400kV Steam Turbine Generator Transformer in July, I had the opportunity to be part of the recovery efforts to bring the site back online before the end of March. It’s been an incredible project with many complexities — one I’ve been involved in from the initial investigations through to energisation. Some personal highlights include: ·        Taking a key role of the auxiliary wiring for the new transformer — including power and control for the tapchanger and cooling systems, protection circuits, alarms and indications. This included helping develop and implement the modifications, designing the marshalling termination schedules and overseeing installation to ensure correct interfacing with the station’s control and protection systems ·        Carrying out an independent review of the transformer cooling settings and suggesting a revised control strategy aimed at improving long-term reliability ·        Taking a lead role in quality assurance throughout the rebuild — overseeing installation tasks, reviewing completed work, and ensuring high standards were consistently maintained Massive credit to the whole project team for managing such a complex and unexpected outage — all while keeping things professional, supportive, and enjoyable. I’ve learned a huge amount, had real responsibility, and worked alongside some brilliant engineers who know how to get the job done (and have a good laugh doing it). A genuinely career-defining project to be part of — and an unforgettable moment seeing Little Barford back online, powering the grid once again. #TeamRWE #RWEGeneration #MissionZero #Transformer #IndustrialPlacement #YearInIndustry #Energy #STEM

  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
Daniel Bradford

Lead Portfolio Electrical Engineer at RWE - Gas Power Generation

1w

Pleasure working with you Rhys during the commissioning stage of this project! See you at Kings Lynn!

Like
Reply

Thanks Rhys and all the #teamRWE for managing this challenge in the last months and bringing the power station safely back online! 👏👏👏

Andrew Lowry

Senior Loss Control Account Professional at AEGIS.

1w

Congratulations and thank you for sharing. Nine months is a long outage, and I assume that a replacement transformer was found in the marketplace as a new factory build can't be done in that time nor a repair. This shows the importance of having access to a spare GSU.

Tom Glover

UK Country Chair at RWE

1w

Congrats to all of the team and thanks for all the hard work!

Daisy Newman

3rd Year Mathematics with Statistics Student at University of Nottingham

6d

Sounds like an incredible experience! So excited to see what comes next 👀👀

Leonard Taggart

Stations & Plant Asset Manager

1w

What caused the failure?

Like
Reply
Glyn Cox

O&M Asset Manager - RWE Generation / Embedded Assets

1w

Fantastic effort by a fantastic team!

Joshua Burgess

Politics with Economics Student - University of Bath | Business Operations Assistant - Australian British Chamber of Commerce

1w

Congrats mate 👏

Jonathan Raggett

Student at the University of Plymouth, Studying BSc Maritime Business with Logistics.

1w

Well done Rhys!

See more comments

To view or add a comment, sign in

Explore topics